REDUCING PROJECT DELAY IN SOEKARNO HATTA INTERNATIONAL AIRPORT (CASE STUDY: TERMINAL 1C REVITALIZATION PROJECT)

Author details:

  • Untung Basuki, Institut Teknologi Bandung, Bandung, Indonesia.
  • Akbar Adhiutama, Institut Teknologi Bandung, Bandung, Indonesia.

Page Numbers: 99 - 99

DOWNLOAD

Download Paper: https://apiarpublications.com/wp-content/uploads/2020/01/25_GCMAR_Nov_2019_BRRABS859_Bus_p.99.pdf